CBAM and the Role of LCA
27 Jan 2025
Read more >A Comprehensive Walkthrough of DWP2 Botlek (Rotterdam Port)
To deliver the large volumes of treated water that will be required to meet the growing needs of the UK’s industrial clusters, will require a specialist capability that only a few companies (across the globe) possess.
Evides Industriewater designed and built the DWP2 Botlek plant, to meet the water needs of 26 industrial customer sites at the Rotterdam Port. Of these sites, one is the largest refinery in Europe. Furthermore, Evides Industriewater constructed the entire supply/return water network.
Soon, the Botlek plant will be delivering highly purified water to a 200MW electrolyser Hydrogen Production facility.
By Evides Industriewater UK Ltd
116 Views