Explore the Impact of Verifying Carbon Capture Technologies
22 Nov 2024
Read more >Join MCE GROUP on Wednesday 27th July between 09.00 and 15.30 as we celebrate the grand opening of our new 19,000 sq/ft valve maintenance facility at GRENADIER HOUSE, UNIT 2 EAGLE COURT, PRESTON FARM, STOCKTON ON TEES. TS18 3TB Refreshments throughout the day, with a Hog Roast lunch served between 11.30 and 13.30.
Meet members of our team and learn about our valve maintenance capabilities, diagnostic services and zero leakage valve solutions.
· Dedicated assembly areas and testing areas, ball and disc lapping, instrument calibration, shot blasting, machining, welding and painting.
· Approved Service Provider for the Emerson range of control and relief valves.
· Complete valve overhaul, re-certification and instrument calibration.
· Single valves to full outages.
· Diagnostic services – V-cal in-line periodic relief valve testing.
· ValvPerformance Testing ™ (Steam Leakage).
· 2 x 10T overhead crane.
· Bespoke in-house designed Valve Management Database.
· ValvTechnologies range of metal seated, ZERO-LEAKAGE, severe service isolation valves.
Please RSVP Selwyn Jones at sjones@valv.com by July 13th.
By MCE Group Plc
568 Views